The Challenge

Replacing a flagpole more than 400 feet above the streets of downtown Minneapolis presented some unique access challenges. The flagpole sits at the top of the historic Minneapolis City Hall clock tower, surrounded by a steep, sloped copper roof that made conventional access methods unfeasible. Crews needed to access the base of the flagpole to disconnect the old flagpole and secure the new one, all while protecting the historic structure and streets down below. Careful planning, coordination between companies, and execution were needed.

    The Solution

    Infinity Scaffold developed a plan to build scaffold underneath the clock tower roof and work outward through the roof hatches. From there, scaffolding was installed out through the roof hatches and finally around the base of the clock tower. This created a secure working platform around the base of the flagpole that allowed the safe removal of the old flagpole and installation of the new flagpole.

    A scaffolding project with this complexity required detailed design, planning, and coordination between all parties involved, resulting in a successful flagpole replacement at Minneapolis City Hall.

    Project Gallery

    Minneapolis City Hall exterior at night
    Historic building masonry restoration scaffolding
    Historic building facade stonework detail
    Construction workers on scaffolding at historic landmark
    Infinity Scaffold

    Copyright © 2019 Infinity Scaffold - All Rights Reserved.

    Quick Links

    Contact

    651-646-4525
    2395 Capp Road, St Paul